Tidal lagoon power
The UK has some of the highest tidal ranges in the world, in areas of shallow water around a number of its coastal areas.
West coast:
- Solway Firth
- Morecombe Bay
- Blackpool
- Mersey
- Colwyn Bay
- Severn Estuary
- Welsh Grounds
- Swansea Bay
- Bridgewater Bay
East coast:
- East Lincs Coast
- The Wash
- Thames Estuary
- Sheerness
South coast.
- Sussex Coast
These places present an opportunity to create artificial lagoons by constructing perimeter breakwater walls to enclose a tidal area. The bunded area is then dredged. Two way hydro turbines are installed in a single section at the base of the perimeter wall through which estuarine water flows in one direction or the other four times daily. For fifteen out of twenty four hours enough tidal flow is generated to operate the turbines and generate electrical power.
One company was formed to design and construct such a scheme in Swansea Bay where the tidal range can reach up to 12m, second highest in the world. See Swansea Bay tidal lagoon for more information.
In March 2015, the same company submitted an Environmental Impact Assessment scoping report for a much larger tidal lagoon between Cardiff and Newport. See Cardiff tidal lagoon for more information.
As tides are more reliable than wind, its energy might be considered a better bet than the rush to erect wind turbines across Britain’s countryside. The Swansea Bay scheme is calculated to save 216,000 tonnes of CO2 annually which is equivalent to taking 81,000 cars off the road. Turbine blades are of a size and speed that allow large fish to freely enter and exit the lagoon without harm. Additionally the perimeter walls provide leisure access for pedestrians and cyclists and the lagoon will attract dinghy sailing and other activities.
However, there remain issues to overcome, including the potential environmental damage (to both plants and animals) and the high strike price needed to make the project viable.
In January 2016, Prime Minister David Cameron cast doubt over tidal power whilst giving evidence to the Parliament’s Liason Committee, when he said, “The problem with tidal power, simply put, is that at the moment we have not seen any ideas come forward that can hit a strike price in terms of pounds per megawatt-hour that is very attractive. That is the challenge for tidal. Maybe they can come up with something. They are very long-term schemes with big investments up front, and they can last for many, many years, but right now my enthusiasm is reduced slightly by the fact that the cost would be quite high.”
[edit] Related articles on Designing Buildings
- Barrage.
- Cardiff tidal lagoon.
- Dam construction.
- Development Consent Order.
- Dove Stone Hydropower.
- Hydroelectricity.
- Hydropower.
- Lagoon.
- Marine energy.
- Renewable energy.
- Thames barrier.
- Tidal estuary.
- Water engineering.
- Water transfers and interconnections.
[edit] External reference
- Construction Manager Magazine, special report 26 August 2015.
- Daedalus Partners LLP (Daedalus) prospectus.
- Technology4Change, Oyster building centrepiece for new £850m tidal project. 14/2/2014.
Featured articles and news
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.